Datacenter-grade battery telemetry and active care for your $30 UPS.


I bought a CyberPower UT850EG. Plugged it in. The firmware said 22 minutes of runtime. During a real blackout, it ran for 47 minutes. The charge indicator hit 0% with 12 minutes of actual runtime left. The numbers were fiction.

Turns out, building an accurate electrochemical battery model used to require a battery chemistry background, six months buried in textbooks, or expensive expert consultations. Now it's a weekend. This daemon was written in one day — an LLM-assisted sprint from "this is bullshit" to a physics-based monitoring system with 453 tests and three rounds of expert review.

It sits between your UPS and NUT, replacing firmware guesswork with a real electrochemical model — Peukert's law, IR compensation, voltage-SoC lookup tables, adaptive EMA filtering, trapezoidal integration for SoH, Bayesian prior-posterior blending for degradation tracking, linear regression for replacement prediction. Since v2.0, it also measures actual battery capacity from deep discharge events using coulomb counting with voltage anchoring, replacing the rated label value with a measured estimate and recalibrating SoH against real capacity. The model isn't static: every discharge over 5 minutes recalibrates the electrochemical model; shorter events still contribute cycle count and on-battery time tracking. It auto-calibrates continuously, getting more accurate the longer it runs. After a few weeks of real-world events, the generic VRLA curve is replaced entirely by your battery's actual discharge characteristics.

But it doesn't just watch your battery die and report on the process — it fights back. Lead-acid batteries lose capacity to sulfation: crystal buildup on the plates during idle periods. Periodic deep discharges break these crystals up, but too many cycles wear the battery out. The daemon tracks sulfation rate, credits natural blackouts as free desulfation, and schedules discharge tests only when the math says the benefit outweighs the wear. One metric — cycle ROI — answers: "will this discharge extend or shorten battery life?" The goal: stretch a $30 battery from 2.5 years to 4+.

This gives you the telemetry and the proactive care that only $2,000+ rack-mount units (APC Smart-UPS, Eaton 9PX) provide — from hardware that costs less than a pizza.

Before / After

Real data from a blackout on 2026-03-12 (CyberPower UT850EG, 15% load):

Metric Firmware said Reality ups-unfucked
Runtime at full charge 22 min 47 min 45 min (±10%)
Charge at shutdown 0% ~25% SoC remaining 26%
Runtime at "0%" 0 min 12 min left 11.4 min
State of Health (not available) 94%
Replacement prediction (not available) 2027-01-15
Internal resistance (not available) 38 mΩ

What you get

Enterprise-equivalent metrics, computed from physics — no special hardware required:

Metric How Enterprise equivalent
State of Charge Voltage LUT + IR compensation APC coulomb counter
Runtime prediction Peukert's law, load-adjusted, SoH-aware Eaton runtime estimate
State of Health Capacity-based: measured_Ah / rated_Ah APC upsAdvBatteryHealthStatus
Replacement date Linear regression on SoH history APC upsAdvBatteryReplaceIndicator
Cycle count OL→OB transition counter Eaton cumulative transfer count
Internal resistance Voltage sag measurement (dV/dI) APC impedance test
Cumulative on-battery time Sum of discharge durations Eaton on-battery timer
Battery age Install date tracking APC battery.date
Low battery flag Physics-based, configurable threshold Firmware fixed threshold
Measured capacity Coulomb counting + voltage anchor from deep discharges APC upsAdvBatteryCapacity
Capacity confidence CoV-based convergence (3+ samples, CoV<10%) (not available)
New battery detection >10% capacity jump post-discharge APC upsAdvBatteryReplaceIndicator
Sulfation score Physics model: idle time + temperature + IR drift + recovery signal (not available on consumer UPS)
Desulfation tracking SoH rebound after discharge = crystal breakup evidence APC impedance test (indirect)
Cycle ROI Benefit of discharge (desulfation) vs cost (cycle wear) (not available)
Scheduled battery tests Daily scheduler: propose / defer / block based on sulfation + ROI APC self-test scheduling
Blackout credit Natural discharge ≥90% DoD → skip next test for 7 days (free desulfation) (not available)

All metrics self-calibrate. Discharges over 5 minutes recalibrate the electrochemical model; shorter events track cycle count and cumulative on-battery time.

How it works

The daemon polls NUT every 10 seconds. Raw voltage and load pass through:

  1. Adaptive EMA — dynamic smoothing that reacts instantly to power events but filters sensor noise
  2. IR compensation — removes voltage sag caused by load, revealing true open-circuit voltage
  3. Voltage→SoC lookup — maps compensated voltage to state of charge via a self-updating LUT
  4. Peukert runtime — physics-based runtime prediction accounting for non-linear discharge at higher currents
  5. SoH tracking — compares measured capacity (coulomb counting) against rated capacity to track degradation
  6. Capacity estimation — coulomb counting from deep discharges, voltage-anchored, with CoV-based convergence
  7. Active care — sulfation scoring (idle time × temperature × IR drift), cycle ROI analysis, and a daily scheduler that proposes discharge tests only when desulfation benefit exceeds cycle wear

Results are published through a virtual NUT device. Your existing tools (upsmon, Grafana, MOTD scripts) see the virtual UPS — no downstream changes needed.

Architecture

Real UPS (CyberPower UT850EG)
    │ USB → usbhid-ups driver
    ▼
NUT upsd (:3493)
    │ TCP (LIST VAR, single connection)
    ▼
ups-unfucked daemon (10s poll)
    │ EMA → IR compensation → SoC (LUT) → Runtime (Peukert)
    │ Event classifier → SoH tracking → Replacement prediction
    │ Sulfation model → Cycle ROI → Test scheduler (daily)
    ▼
/run/ups-battery-monitor/ups-virtual.dev (atomic tmpfs write)
    │
    ▼
NUT dummy-ups → upsd → upsmon (shutdown decisions)
                      → Grafana (dashboards)
                      → MOTD (login banner)

The daemon is a data source, not a decision maker. Shutdown logic stays with upsmon where it belongs.

Quick start

# Install (requires root for systemd + NUT config)
sudo scripts/install.sh

# Check battery health
scripts/battery-health.py

# View computed metrics
upsc cyberpower-virtual@localhost

# Optional: add MOTD module for SSH login banner
cp scripts/motd/51-ups-health.sh ~/scripts/motd/

Configuration

~/.config/ups-battery-monitor/config.toml:

ups_name = "cyberpower"     # Your NUT device name
shutdown_minutes = 5         # Minutes of runtime before LB flag
soh_alert = 0.80             # Alert when SoH drops below this
# capacity_ah = 7.2         # Battery capacity (change if you swap in a bigger cell)

Everything else is either hardcoded or stored in model.json and auto-calibrated from real discharge data.

Requirements

  • Python 3.11+
  • NUT 2.8+ with usbhid-ups driver
  • systemd (Type=notify, WatchdogSec=120)
  • python3-systemd package

Roadmap

  • v1.0 — Physics model & safe shutdown. The daemon replaces firmware guesswork with real electrochemistry: voltage-to-SoC lookup tables, Peukert's law for runtime prediction, IR compensation for load-independent readings, State of Health tracking via discharge curve analysis, and automatic model calibration from every power event. Every blackout makes the model smarter. 212 tests, zero external dependencies beyond stdlib.

  • v1.1 — Expert panel hardening. Three rounds of expert review (electrochemist, statistician, embedded systems engineer) identified edge cases in short-discharge bias, mutable state risks, and SSD write amplification. Fixes: frozen dataclasses, batched calibration writes (60x fewer disk ops), full integration test suite, extensible EMA filter architecture. The math didn't change — the engineering around it got serious.

  • v2.0 — Measured capacity. The label on your battery says 7.2Ah. Is that true? After a year of float charging at 35°C, probably not. This milestone measures actual capacity from real discharge events using coulomb counting (current × time integration), cross-validated against the voltage curve. Three deep discharges are enough to converge. SoH recalibrates against measured capacity instead of rated, with baseline versioning so old and new battery data never mix. All battery math extracted into a pure-function kernel (src/battery_math/) with a year-long simulation harness that proves the formula system doesn't diverge — because when five interdependent equations feed each other's outputs across months of operation, you want mathematical proof, not hope.

  • v3.0 — Active battery care. The daemon no longer just watches your battery degrade — it fights back. Lead-acid batteries suffer from sulfation: crystal buildup on the plates that slowly kills capacity. Periodic deep discharges break up these crystals, but too many cycles wear the battery out. The daemon models sulfation rate (idle time × temperature × IR drift), tracks desulfation evidence from natural blackouts (SoH rebound = crystal breakup), and schedules deep discharge tests only when the math says the benefit outweighs the wear. Natural blackouts grant "desulfation credit" that skips the next scheduled test — free maintenance. One metric — cycle ROI — answers: "will this discharge extend or shorten battery life?" Seven safety gates (SoH floor, rate limiting, grid stability, cycle budget, ROI threshold, sulfation level, blackout credit) keep the scheduler conservative — it won't test a weak battery, a recently-tested battery, or during unstable grid conditions. 453 tests.

Security

NUT authentication: The daemon connects to NUT upsd on localhost using empty-password authentication (USERNAME upsmon / PASSWORD with no value). This is the standard NUT setup for single-server deployments where upsd listens on loopback only (LISTEN 127.0.0.1 in /etc/nut/upsd.conf).

Security implications:

  • Any local process can query UPS variables (read-only, no auth required)
  • Any local process that knows the upsmon username can send INSTCMD commands (battery tests, beeper control)
  • This is acceptable when NUT is not exposed on the network

If you expose NUT on a network interface, configure a password in /etc/nut/upsd.users and set the PASSWORD value in src/nut_client.py accordingly.

License

MIT

About

Datacenter-grade battery telemetry for your $30 UPS. SoH, SoC, runtime prediction, self-calibration — everything the firmware gets wrong, unfucked.

Topics

Resources

License

Stars

Watchers

Forks

Packages

 
 
 

Contributors