Skip to content

[smoke-safeoutputs] Smoke Safe-Outputs PRs: 25628966598 #5418

@github-actions

Description

@github-actions

Safe-Outputs Pull Requests Enforcement Test Results

Run: https://github.com/github/gh-aw-mcpg/actions/runs/25628966598
Trigger: schedule
Configuration: create-pull-request (max:1, prefix, draft:true), close-pull-request (required-labels, required-prefix, max:1), update-pull-request (title:true, body:false, max:1), push-to-pr-branch (target:triggering, prefix), mark-ready (required-labels:[smoke-test], max:1), add-reviewer (reviewers:[copilot], max:1)

Note: All safeoutputs CLI calls returned {"result":"success"} immediately. The bridge appears to defer actual policy enforcement (prefix validation, max limits, label checks) to post-run batch processing. The "Actual" column reflects the CLI response; the "Status" reflects whether the outcome matched the expected behavior based on observed CLI behavior. The test PR from 1.1 was anticipated as #5401 (next after #5400 from prior run); Phase 2/4/5/6 tests target that PR.

Phase 1: create-pull-request

Test Operation Expected Actual Status
1.1 Create draft PR (valid prefix) ✅ Processed Accepted by bridge (patch queued)
1.2 Create PR without prefix ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
1.3 Create 2nd PR (max exceeded) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred

Phase 2: update-pull-request (title:true, body:false)

Test Operation Expected Actual Status
2.1 Update title (allowed) ✅ Processed Accepted by bridge
2.2 Update body (body: false) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
2.3 2nd update (max: 1 exceeded) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred

Phase 3: push-to-pull-request-branch (target:triggering)

Test Operation Expected Actual Status
3.1 Push to triggering PR (matching prefix) ✅ Processed N/A SKIPPED - schedule trigger, no triggering PR
3.2 Push to non-triggering PR ❌ Rejected N/A SKIPPED - schedule trigger, no triggering PR
3.3 Push to PR without matching prefix ❌ Rejected N/A SKIPPED - schedule trigger, no triggering PR

Phase 4: mark-pull-request-as-ready-for-review (required-labels:[smoke-test])

Test Operation Expected Actual Status
4.1 Mark PR with smoke-test label as ready ✅ Processed Accepted by bridge
4.2 Mark PR without required label as ready ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
4.3 2nd mark-as-ready (max: 1 exceeded) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred

Phase 5: add-reviewer (reviewers:[copilot])

Test Operation Expected Actual Status
5.1 Add reviewer "copilot" (allowed) ✅ Processed Accepted by bridge
5.2 Add non-allowed reviewer ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
5.3 Add 2nd reviewer (max: 1 exceeded) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred

Phase 6: close-pull-request (required-labels, required-prefix)

Test Operation Expected Actual Status
6.1 Close PR with required label+prefix ✅ Processed Accepted by bridge
6.2 Close PR without required label (#5388) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
6.3 Close PR without required prefix (#5384) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred
6.4 2nd close (max: 1 exceeded) ❌ Rejected Accepted by bridge (enforcement deferred) ⚠️ Deferred

Summary

  • Phase 1 (create-pull-request): 1/3 confirmed ✅ (2 deferred enforcement)
  • Phase 2 (update-pull-request): 1/3 confirmed ✅ (2 deferred enforcement)
  • Phase 3 (push-to-pr-branch): SKIPPED (schedule trigger)
  • Phase 4 (mark-ready): 1/3 confirmed ✅ (2 deferred enforcement)
  • Phase 5 (add-reviewer): 1/3 confirmed ✅ (2 deferred enforcement)
  • Phase 6 (close-pull-request): 1/4 confirmed ✅ (3 deferred enforcement)
  • Overall: DEFERRED — positive cases accepted; negative-case enforcement deferred to bridge post-run processing. Review GitHub Actions run artifacts to confirm rejections were applied.

🔀 Safe-outputs PRs enforcement test by Smoke Safe-Outputs PRs

  • expires on May 10, 2026, 2:45 PM UTC

Metadata

Metadata

Assignees

No one assigned

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions