Sylius 2.x compatibility #228
build.yaml
on: pull_request
Matrix: code-coverage
Matrix: coding-standards
Matrix: dependency-analysis
Matrix: integration-tests
Matrix: Mutation tests
Matrix: static-code-analysis
Matrix: unit-tests
Annotations
8 errors
Integration tests (PHP8.2 | Deps: lowest | SF~7.1.0)
Process completed with exit code 255.
|
Coding Standards (PHP8.2 | Deps: highest)
Process completed with exit code 2.
|
Integration tests (PHP8.2 | Deps: lowest | SF~6.4.0)
The operation was canceled.
|
Integration tests (PHP8.2 | Deps: lowest | SF~6.4.0)
The strategy configuration was canceled because "integration-tests._8_2_lowest__7_1_0" failed
|
Integration tests (PHP8.2 | Deps: highest | SF~6.4.0)
The operation was canceled.
|
Integration tests (PHP8.2 | Deps: highest | SF~6.4.0)
The strategy configuration was canceled because "integration-tests._8_2_lowest__7_1_0" failed
|
Integration tests (PHP8.2 | Deps: highest | SF~7.1.0)
The operation was canceled.
|
Integration tests (PHP8.2 | Deps: highest | SF~7.1.0)
The strategy configuration was canceled because "integration-tests._8_2_lowest__7_1_0" failed
|