To produce a testable prototype demonstrating a number of proposed new features and experience enhancements within a cohesive Hubs system. The prototype need only be to a standard suitable for testing, placing emphasis on a cohesive system over polished individual parts.
This is to be delivered by the end June 2021.
List view
0 issues of 8 selected
- Status: Open.#2312 In Hubs-Foundation/hubs;
- Status: Open.#3285 In Hubs-Foundation/hubs;
- Status: Open.#3545 In Hubs-Foundation/hubs;
- Status: Open.#3746 In Hubs-Foundation/hubs;
- Status: Open.#3747 In Hubs-Foundation/hubs;
- Status: Open.#3780 In Hubs-Foundation/hubs;
- Status: Open.#3782 In Hubs-Foundation/hubs;
- Status: Open.#3855 In Hubs-Foundation/hubs;