Skip to content

tools/debug-cli: minor tweaks #439

tools/debug-cli: minor tweaks

tools/debug-cli: minor tweaks #439

Triggered via push March 29, 2025 16:25
Status Failure
Total duration 1m 7s
Artifacts

test.yml

on: push
Matrix: integration-tests
Matrix: unit-tests
Matrix: e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration-tests (16.x)
Process completed with exit code 1.
integration-tests (23.x)
Process completed with exit code 1.
integration-tests (23.x)
The strategy configuration was canceled because "integration-tests._16_x" failed
integration-tests (20.x)
The operation was canceled.
integration-tests (20.x)
The strategy configuration was canceled because "integration-tests._16_x" failed
integration-tests (22.x)
The operation was canceled.
integration-tests (22.x)
The strategy configuration was canceled because "integration-tests._16_x" failed
integration-tests (18.x)
The operation was canceled.
integration-tests (18.x)
The strategy configuration was canceled because "integration-tests._16_x" failed