chore(ci)(deps): bump actions/setup-go from 5 to 6 #1221
test.yml
on: pull_request
Matrix: test
Build docs and Coveralls integration
0s
Annotations
7 errors
|
Test with 1.21 and CROSS_COMPILE=false
Process completed with exit code 2.
|
|
Test with 1.21 and CROSS_COMPILE=true
Process completed with exit code 2.
|
|
Test with 1.21 and CROSS_COMPILE=true
The strategy configuration was canceled because "test._1_21_false" failed
|
|
Test with 1.22 and CROSS_COMPILE=true
The operation was canceled.
|
|
Test with 1.22 and CROSS_COMPILE=true
The strategy configuration was canceled because "test._1_21_false" failed
|
|
Test with 1.22 and CROSS_COMPILE=false
The operation was canceled.
|
|
Test with 1.22 and CROSS_COMPILE=false
The strategy configuration was canceled because "test._1_21_false" failed
|