.github/workflows: add tests for Go 1.26-rc.1 #7104

.github/workflows: add tests for Go 1.26-rc.1

.github/workflows: add tests for Go 1.26-rc.1 #7104

Triggered via push December 26, 2025 15:08
Status Failure
Total duration 4m 40s
Artifacts

test.yml

on: push
Matrix: test
Matrix: wasm
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Test with Go 1.26.0-rc.1 on ubuntu-latest
Process completed with exit code 2.
Test with Go 1.25.x on windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.25.x on windows-latest
The operation was canceled.
Test with Go 1.24.x on windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.24.x on windows-latest
The operation was canceled.
Test with Go 1.26.0-rc.1 on windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.26.0-rc.1 on windows-latest
The operation was canceled.
Test with Go 1.25.x on ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.25.x on ubuntu-latest
The operation was canceled.
Test with Go 1.24.x on ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.24.x on ubuntu-latest
The operation was canceled.
Test with Go 1.25.x on macos-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.25.x on macos-latest
The operation was canceled.
Test with Go 1.24.x on macos-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed
Test with Go 1.24.x on macos-latest
The operation was canceled.
Test with Go 1.26.0-rc.1 on macos-latest
The strategy configuration was canceled because "test.ubuntu-latest_1_26_0-rc_1" failed